EV Charger Installation in Guzape, Abuja
Guzape is still being built, and that is an advantage almost nobody uses. The cheapest moment to install EV charging is while the walls are open and the driveway has not been laid. If your house is under construction, this is the page that will save you money.
We are on site for inspection and evaluation within 6 hours, anywhere in the FCT. Call 0706 727 6002, open 24 hours.
What is different about installing in Guzape
First fix is the cheap moment. Running a conduit and a draw wire from the distribution board to the carport during construction costs a fraction of doing it afterwards, and it means no surface conduit and no lifted paving later. Even if you do not own an electric car yet, the duct is worth laying.
Hillside plots mean longer, steeper routes. Guzape terrain puts parking on a different level from the house on many plots. Cable lengths grow and containment has to survive a slope and a driveway. Planned at first fix, none of that is a problem.
New builds often have three-phase. Where a genuine, balanced three-phase supply exists, a 22kW charger becomes a real option. We check the balance rather than assuming it, because loading one phase makes an existing imbalance worse.
Design the inverter and the charger together. Most new houses here are being built with an inverter and battery system. If you want the car to charge during an outage, the inverter has to hold the charger continuous load, or the charger has to be set to draw less. Deciding that at the design stage costs nothing.
What we do for Guzape properties
Every installation, wherever it is, includes a dedicated circuit, correct DC-fault protection, a measured earth and a live charge test. These are the parts that matter particularly here.
- First-fix conduit and draw wire to the carport while the building is still open
- A dedicated way reserved at the distribution board for the charger circuit
- Earth electrode installed and tested as part of the building earthing arrangement
- Three-phase assessment where the supply supports 22kW charging
- Charger and inverter sized together, with a current limit for inverter operation
- Full installation and commissioning whenever you are ready for the unit itself
On site within 6 hours, anywhere in the FCT
Call us and we come out for inspection and evaluation within six hours, whether you are in Guzape, the city centre or an area council. You get a written quote with the full installation cost broken down line by line afterwards, because installation cost differs from job to job and a single number tells you nothing.
Nearby districts we also cover
Asokoro
Maitama
Garki
Central Area
Wuye
What our customers say
Rated 5.0 out of 5 from 3 Google reviews. Read every one of them, unedited, on our Google Business Profile.
“Great service and fast response I will give you guys a 9/10.”
Finding the charger: very easy
Kekeboro Obarijima · Google review
“Had a smooth charging experience at this Abuja EV charger installation, very user friendly. The fast electric vehicle charging and reliable public EV power make it the best spot in the FCT. Will definitely be back.”
john mmoh · Google review
“Great service.”
HID ACADEMY · Google review
Questions from Guzape
Not covered here? Ask on the phone. It is quicker than guessing.
Lay a conduit and draw wire from the distribution board to where the car will park, and reserve a way on the board. It costs very little now and saves a great deal later, whether or not you buy an electric car this year.
Yes. We are often brought in to specify the charging provision while the electrical first fix is happening, then return to install and commission the charger later.
Only for cable length and containment, both of which are easy to plan before the driveway is laid and awkward afterwards.
Within six hours of your call. Site visits during construction are the most useful ones we do.
Book an inspection in Guzape
Call or send a WhatsApp message and we are with you within six hours for inspection and evaluation. Afterwards you get a written quote with the full installation cost broken down line by line.
On site for inspection within 6 hours, anywhere in the FCT. Open 24 hours, seven days a week.